Concrete Headwalls & Drainage Installation — Lake Livingston Area
Hannah Montana CDR completed concrete headwall and drainage work in the Lake Livingston area. The project involved installation of concrete drainage structures around culvert pipe connections to create a defined and durable drainage point within the site. The supplied project photography shows the completed concrete headwalls, pipe openings and surrounding earthwork area, providing a clear example of Hannah Montana CDR's combined dirt-work and concrete capabilities.
Drainage projects require multiple scopes to work together correctly. The surrounding earthwork, pipe locations and concrete drainage structures all need to align so the completed system can direct water through the intended drainage path. This project required work within an excavated area while constructing concrete headwall sections around the drainage pipe connections.
The project involved construction of concrete headwall sections around multiple drainage pipe openings. The finished structure provides defined concrete faces at the culvert connections and creates a durable transition between the drainage pipes and surrounding site. The photographs document: - Finished concrete headwalls - Multiple pipe penetrations - Drainage-structure layout - Excavated surrounding site - Construction equipment positioned near the installation
Project Photos